The Lincoln Gap (Stage 1) Wind Farm consisted of 35 Senvion 3.6M140 EBC wind turbine generators situated near Whyalla in South Australia. ARES transported all wind turbine components from the Port of Whyalla to site over a period of 24 weeks.
Flattering Figures
Here’s a high level look at what we were able to achieve on this project: